Library Building Update Series (Week of May 3, 2019)
![Interior of the library under construction, with the ceiling of the room now installed.](https://www.haverford.edu/sites/default/files/styles/marquee_top_image/public/4-29-19.jpg?itok=0w9nExFD)
Details
Published
Tiles, ceilings, and windows!
Tile installation on Level 1; ceiling grid installed in the Instruction and Events Room; the window for Quaker and Special Collections is installed and finishes are being installed in the reading room; sprinkler heads are being dropped for Level 2; mechanical work is being wrapped up. Stack construction continues. Paint colors finalized.